When the floor leaves the floor department, it enters into the area where sidewalls and interior walls are set and secured. Tub surrounds are installed and bath tubs are plumbed and secured.
Much of the electrical work is done in this area. Electrical wire is run and the panel box is secured and wired. Both base and overhead cabinets are installed.